━ SCAFFOLDING SERVICES ━

Addenbrookes Hospital Eye Unit

Hospital Scaffolding Case Study addenbrookes nationwide scaffolding services

PROJECT TITLE: Addenbrookes Eye Clinic
CUSTOMER:
W. Portsmouth & Co Ltd
CONTACT PERSON:  Adam Kenny – Contracts Manager
ADDRESS OF SITE: Addenbrookes Hospital Eye Clinic, Cambridge, CB2 0QQ
CONTRACT VALUE: £100,000
CONTRACT DURATION: 27th February 2025 – June 2026
LOCATION OF WORKS: Addenbrookes Hospital Eye Clinic – Front of clinic entrance, Roof, Internal courtyard

 

SCOPE OF WORKS

17m long x 17m high beamed bridge from roadside to courtyard to allow up to a 2 tonne load to be lifted from one side to the other. This will all be made possible by a 20m long Niko rail system attached to the top of the scaffold and will allow machinery to be lowered into the court yard to move and clear materials into tonne bags and lifted up and over to the front, back down onto a design 2tn loading bay at the roadside .

Hospital Scaffolding Case Study

    Contact Us

    About your next scaffolding project.

    Case Study Download

    Click below to download the full case study pdf document..

    DOWNLOAD PDF

    OUR BETTER VISION ━

    What We Serve Site Areas

    Sed ut persiciatis unde omnis ste natus error voupttem accusantiu laudaintium, totaim aperiaim, eaque quaeilo Lorem ipsum doloramet, consectietuer adipiscing.

      Get In Touch